I-70 (SR-70) Ebl over Willow Creek Access Road
FairSevier County, Utah · 2.2 Mi.N.No.Richfield Int · Structure no. 2F 533
- Built
- 1989
- 36 years old
- Condition
- Fair
- inspected May 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 101 ft
- 1 main span
- Daily traffic
- 10,111
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
I-70 (SR-70) Ebl over Willow Creek Access Road is a prestressed concrete stringer/multi-beam or girder carrying I-70 (SR-70) Ebl over Willow Creek Access Road in Sevier County, Utah. It was built in 1989, so it is 36 years old, younger than the Utah average of 40.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 10,111 vehicles a day, roughly 33% of them trucks, projected to reach 12,133 by 2042. The structure is 101 ft (30.8 m) long and 44 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-70 (SR-70) Ebl over Willow Creek Access Road built?
It was built in 1989, making it 36 years old in 2025.
What condition is I-70 (SR-70) Ebl over Willow Creek Access Road in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.
How much traffic does I-70 (SR-70) Ebl over Willow Creek Access Road carry?
About 10,111 vehicles per day (2022 count), of which roughly 33% are trucks.
How long is I-70 (SR-70) Ebl over Willow Creek Access Road?
The structure is 101 ft (30.8 m) long with a longest span of 98 ft (30 m) and a deck 44 ft wide.
Who owns I-70 (SR-70) Ebl over Willow Creek Access Road?
It is owned by the State Highway Agency.