US Bridges

Clear Crk.Cyn.Road over I-70 (SR-70) Ebl & W

Fair

Sevier County, Utah · 0.5 Mi.W.Sevier Interchg. · Structure no. 0F 497

Built
1984
41 years old
Condition
Fair
inspected May 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
283 ft
2 main spans
Daily traffic
206
2021 count
Owner
State
State Highway Agency

About this bridge

Clear Crk.Cyn.Road over I-70 (SR-70) Ebl & W is a prestressed concrete continuous stringer/multi-beam or girder carrying Clear Crk.Cyn.Road over I-70 (SR-70) Ebl & W in Sevier County, Utah. It was built in 1984, so it is 41 years old, older than the Utah average of 40.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 206 vehicles a day, roughly 61% of them trucks, projected to reach 247 by 2041. The structure is 283 ft (86.2 m) long and 32 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

CarriesClear Crk.Cyn.Road
CrossesI-70 (SR-70) Ebl & W
Location0.5 Mi.W.Sevier Interchg.
RouteCounty Highway 2524
StateUtah
Coordinates38.59014, -112.27061
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating107.1 US tons
Inventory rating49.6 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20 + Mod
Structure length283 ft (86.2 m)
Longest span140 ft (42.7 m)
Deck width32 ft (9.8 m)
Roadway width29 ft (8.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic206 (2021)
Projected traffic247 by 2041
Trucks61%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Clear Crk.Cyn.Road over I-70 (SR-70) Ebl & W built?

It was built in 1984, making it 41 years old in 2025.

What condition is Clear Crk.Cyn.Road over I-70 (SR-70) Ebl & W in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.

How much traffic does Clear Crk.Cyn.Road over I-70 (SR-70) Ebl & W carry?

About 206 vehicles per day (2021 count), of which roughly 61% are trucks.

How long is Clear Crk.Cyn.Road over I-70 (SR-70) Ebl & W?

The structure is 283 ft (86.2 m) long with a longest span of 140 ft (42.7 m) and a deck 32 ft wide.

Who owns Clear Crk.Cyn.Road over I-70 (SR-70) Ebl & W?

It is owned by the State Highway Agency.