CO.FNTG.RD.AJ.I-70 over Salina Creek
FairSevier County, Utah · Salina Canyon E. Alumbed · Structure no. 041045E
- Built
- 1968
- 57 years old
- Condition
- Fair
- inspected May 2024
- Type
- Culvert
- Concrete Continuous
- Length
- 25 ft
- 2 main spans
- Daily traffic
- 10
- 2010 count
- Owner
- County
- County Highway Agency
About this bridge
CO.FNTG.RD.AJ.I-70 over Salina Creek is a concrete continuous culvert carrying CO.FNTG.RD.AJ.I-70 over Salina Creek in Sevier County, Utah. It was built in 1968, so it is 57 years old, older than the Utah average of 40.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 10 vehicles a day, projected to reach 12 by 2030. The structure is 25 ft (7.7 m) long. If it were closed, the detour would be 19.9 mi (32 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 7 Good | Some minor problems. |
| Culvert | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CO.FNTG.RD.AJ.I-70 over Salina Creek built?
It was built in 1968, making it 57 years old in 2025.
What condition is CO.FNTG.RD.AJ.I-70 over Salina Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.
How much traffic does CO.FNTG.RD.AJ.I-70 over Salina Creek carry?
About 10 vehicles per day (2010 count).
How long is CO.FNTG.RD.AJ.I-70 over Salina Creek?
The structure is 25 ft (7.7 m) long with a longest span of 11 ft (3.5 m).
Who owns CO.FNTG.RD.AJ.I-70 over Salina Creek?
It is owned by the County Highway Agency.