US Bridges

200 South Street over City Creek Flood Channel

Fair

Sanpete County, Utah · 450 W. 200 S. Manti · Structure no. 039033D

Built
2000
25 years old
Condition
Fair
inspected March 2024
Type
Culvert
Concrete
Length
27 ft
1 main span
Daily traffic
113
2010 count
Owner
City
City or Municipal Highway Agency

About this bridge

200 South Street over City Creek Flood Channel is a concrete culvert carrying 200 South Street over City Creek Flood Channel in Sanpete County, Utah. It was built in 2000, so it is 25 years old, younger than the Utah average of 40.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 113 vehicles a day, roughly 1% of them trucks, projected to reach 137 by 2030. The structure is 27 ft (8.2 m) long. If it were closed, the detour would be 1.2 mi (2 km).

Carries200 South Street
CrossesCity Creek Flood Channel
Location450 W. 200 S. Manti
RouteCity Street 0
StateUtah
Coordinates39.26253, -111.64533
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating35.7 US tons
Inventory rating21.4 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHS 20 + Mod
Structure length27 ft (8.2 m)
Longest span25 ft (7.6 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic113 (2010)
Projected traffic137 by 2030
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was 200 South Street over City Creek Flood Channel built?

It was built in 2000, making it 25 years old in 2025.

What condition is 200 South Street over City Creek Flood Channel in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.

How much traffic does 200 South Street over City Creek Flood Channel carry?

About 113 vehicles per day (2010 count), of which roughly 1% are trucks.

How long is 200 South Street over City Creek Flood Channel?

The structure is 27 ft (8.2 m) long with a longest span of 25 ft (7.6 m).

Who owns 200 South Street over City Creek Flood Channel?

It is owned by the City or Municipal Highway Agency.