US Bridges

I-80 WB Col-Dist. over 300 W.St.In So.Salt Lake

Fair

Salt Lake County, Utah · I80-I15 Intchg.@ 240 · Structure no. 4C 853

Built
1999
26 years old
Condition
Fair
inspected July 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
330 ft
2 main spans
Daily traffic
29,634
2012 count
Owner
State
State Highway Agency

About this bridge

I-80 WB Col-Dist. over 300 W.St.In So.Salt Lake is a steel continuous stringer/multi-beam or girder carrying I-80 WB Col-Dist. over 300 W.St.In So.Salt Lake in Salt Lake County, Utah. It was built in 1999, so it is 26 years old, younger than the Utah average of 40.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 29,634 vehicles a day, roughly 15% of them trucks, projected to reach 37,043 by 2032. The structure is 330 ft (100.5 m) long and 96 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesI-80 WB Col-Dist.
Crosses300 W.St.In So.Salt Lake
LocationI80-I15 Intchg.@ 240
RouteInterstate 80
StateUtah
Coordinates40.71856, -111.89951
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating57.1 US tons
Inventory rating57.1 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 25 or greater
Structure length330 ft (100.5 m)
Longest span164 ft (50 m)
Deck width96 ft (29.4 m)
Roadway width94 ft (28.7 m)
Vertical clearance over deck99 ft (30.2 m)

Traffic and service

Average daily traffic29,634 (2012)
Projected traffic37,043 by 2032
Trucks15%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-80 WB Col-Dist. over 300 W.St.In So.Salt Lake built?

It was built in 1999, making it 26 years old in 2025.

What condition is I-80 WB Col-Dist. over 300 W.St.In So.Salt Lake in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.

How much traffic does I-80 WB Col-Dist. over 300 W.St.In So.Salt Lake carry?

About 29,634 vehicles per day (2012 count), of which roughly 15% are trucks.

How long is I-80 WB Col-Dist. over 300 W.St.In So.Salt Lake?

The structure is 330 ft (100.5 m) long with a longest span of 164 ft (50 m) and a deck 96 ft wide.

Who owns I-80 WB Col-Dist. over 300 W.St.In So.Salt Lake?

It is owned by the State Highway Agency.