US Bridges

Mvc (SR-85) Sbl over D&rg RR

Good

Salt Lake County, Utah · 5800 West 4500 S · Structure no. 3F 869

Built
2017
8 years old
Condition
Good
inspected November 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
135 ft
1 main span
Daily traffic
1,300
2016 count
Owner
State
State Highway Agency

About this bridge

Mvc (SR-85) Sbl over D&rg RR is a prestressed concrete stringer/multi-beam or girder carrying Mvc (SR-85) Sbl over D&rg RR in Salt Lake County, Utah. It was built in 2017, so it is 8 years old, younger than the Utah average of 40.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,300 vehicles a day, roughly 10% of them trucks, projected to reach 16,250 by 2036. The structure is 135 ft (41 m) long and 49 ft wide.

CarriesMvc (SR-85) Sbl
CrossesD&rg RR
Location5800 West 4500 S
RouteState Highway 85
StateUtah
Coordinates40.67269, -112.03135
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating53.6 US tons
Inventory rating39.2 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length135 ft (41 m)
Longest span130 ft (39.7 m)
Deck width49 ft (14.9 m)
Roadway width47 ft (14.3 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic1,300 (2016)
Projected traffic16,250 by 2036
Trucks10%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesRailroad
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Mvc (SR-85) Sbl over D&rg RR built?

It was built in 2017, making it 8 years old in 2025.

What condition is Mvc (SR-85) Sbl over D&rg RR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does Mvc (SR-85) Sbl over D&rg RR carry?

About 1,300 vehicles per day (2016 count), of which roughly 10% are trucks.

How long is Mvc (SR-85) Sbl over D&rg RR?

The structure is 135 ft (41 m) long with a longest span of 130 ft (39.7 m) and a deck 49 ft wide.

Who owns Mvc (SR-85) Sbl over D&rg RR?

It is owned by the State Highway Agency.