US Bridges

Ramp I80EB to I15N over 1000 West Street

Fair

Salt Lake County, Utah · 250 SO.1000 West in Slc. · Structure no. 2F 645

Built
1999
26 years old
Condition
Fair
inspected July 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
128 ft
1 main span
Daily traffic
61,660
2014 count
Owner
State
State Highway Agency

About this bridge

Ramp I80EB to I15N over 1000 West Street is a prestressed concrete stringer/multi-beam or girder carrying Ramp I80EB to I15N over 1000 West Street in Salt Lake County, Utah. It was built in 1999, so it is 26 years old, younger than the Utah average of 40.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 61,660 vehicles a day, roughly 15% of them trucks, projected to reach 77,075 by 2034. The structure is 128 ft (39 m) long and 31 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesRamp I80EB to I15N
Crosses1000 West Street
Location250 SO.1000 West in Slc.
RouteInterstate 80
StateUtah
Coordinates40.7643, -111.9201
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating50 US tons
Inventory rating46.4 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 25 or greater
Structure length128 ft (39 m)
Longest span125 ft (38.1 m)
Deck width31 ft (9.3 m)
Roadway width28 ft (8.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic61,660 (2014)
Projected traffic77,075 by 2034
Trucks15%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Ramp I80EB to I15N over 1000 West Street built?

It was built in 1999, making it 26 years old in 2025.

What condition is Ramp I80EB to I15N over 1000 West Street in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.

How much traffic does Ramp I80EB to I15N over 1000 West Street carry?

About 61,660 vehicles per day (2014 count), of which roughly 15% are trucks.

How long is Ramp I80EB to I15N over 1000 West Street?

The structure is 128 ft (39 m) long with a longest span of 125 ft (38.1 m) and a deck 31 ft wide.

Who owns Ramp I80EB to I15N over 1000 West Street?

It is owned by the State Highway Agency.