US Bridges

C-D a (I-15 Nb) over 8000 S

Good

Salt Lake County, Utah · I-15 NB over 8000 S · Structure no. 1F 920

Built
2021
4 years old
Condition
Good
inspected October 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
120 ft
3 main spans
Daily traffic
54,400
2020 count
Owner
State
State Highway Agency

About this bridge

C-D a (I-15 Nb) over 8000 S is a prestressed concrete stringer/multi-beam or girder carrying C-D a (I-15 Nb) over 8000 S in Salt Lake County, Utah. It was built in 2021, so it is 4 years old, younger than the Utah average of 40.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 54,400 vehicles a day, roughly 22% of them trucks, projected to reach 58,800 by 2040. The structure is 120 ft (36.7 m) long and 63 ft wide. If it were closed, the detour would be 6.8 mi (11 km).

CarriesC-D a (I-15 Nb)
Crosses8000 S
LocationI-15 NB over 8000 S
RouteInterstate 15
StateUtah
Coordinates40.606, -111.905
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating67.9 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length120 ft (36.7 m)
Longest span69 ft (21 m)
Deck width63 ft (19.1 m)
Roadway width60 ft (18.3 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic54,400 (2020)
Projected traffic58,800 by 2040
Trucks22%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed6.8 mi (11 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was C-D a (I-15 Nb) over 8000 S built?

It was built in 2021, making it 4 years old in 2025.

What condition is C-D a (I-15 Nb) over 8000 S in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does C-D a (I-15 Nb) over 8000 S carry?

About 54,400 vehicles per day (2020 count), of which roughly 22% are trucks.

How long is C-D a (I-15 Nb) over 8000 S?

The structure is 120 ft (36.7 m) long with a longest span of 69 ft (21 m) and a deck 63 ft wide.

Who owns C-D a (I-15 Nb) over 8000 S?

It is owned by the State Highway Agency.