Clima Drive over SR-85 (mvc)
GoodSalt Lake County, Utah · Clima DR over SR-85 · Structure no. 0F 909
- Built
- 2021
- 4 years old
- Condition
- Good
- inspected November 2022
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 235 ft
- 2 main spans
- Daily traffic
- 8,787
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
Clima Drive over SR-85 (mvc) is a prestressed concrete stringer/multi-beam or girder carrying Clima Drive over SR-85 (mvc) in Salt Lake County, Utah. It was built in 2021, so it is 4 years old, younger than the Utah average of 40.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 8,787 vehicles a day, roughly 16% of them trucks, projected to reach 10,984 by 2040. The structure is 235 ft (71.7 m) long and 56 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Clima Drive over SR-85 (mvc) built?
It was built in 2021, making it 4 years old in 2025.
What condition is Clima Drive over SR-85 (mvc) in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2022.
How much traffic does Clima Drive over SR-85 (mvc) carry?
About 8,787 vehicles per day (2020 count), of which roughly 16% are trucks.
How long is Clima Drive over SR-85 (mvc)?
The structure is 235 ft (71.7 m) long with a longest span of 126 ft (38.5 m) and a deck 56 ft wide.
Who owns Clima Drive over SR-85 (mvc)?
It is owned by the State Highway Agency.