I-215 (SR-215) over Surplus Canal and RR
FairSalt Lake County, Utah · 2000 W. 1100 So. in Slc · Structure no. 0F 410
- Built
- 1988
- 37 years old
- Condition
- Fair
- inspected December 2022
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 403 ft
- 3 main spans
- Daily traffic
- 5,837
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
I-215 (SR-215) over Surplus Canal and RR is a prestressed concrete continuous stringer/multi-beam or girder carrying I-215 (SR-215) over Surplus Canal and RR in Salt Lake County, Utah. It was built in 1988, so it is 37 years old, younger than the Utah average of 40.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 5,837 vehicles a day, roughly 15% of them trucks, projected to reach 7,004 by 2037. The structure is 403 ft (122.9 m) long and 170 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-215 (SR-215) over Surplus Canal and RR built?
It was built in 1988, making it 37 years old in 2025.
What condition is I-215 (SR-215) over Surplus Canal and RR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2022.
How much traffic does I-215 (SR-215) over Surplus Canal and RR carry?
About 5,837 vehicles per day (2017 count), of which roughly 15% are trucks.
How long is I-215 (SR-215) over Surplus Canal and RR?
The structure is 403 ft (122.9 m) long with a longest span of 140 ft (42.7 m) and a deck 170 ft wide.
Who owns I-215 (SR-215) over Surplus Canal and RR?
It is owned by the State Highway Agency.