US Bridges

Porterrockwellblvd over U&sl Canal

Fair

Salt Lake County, Utah · Blvd over U&sl Canal · Structure no. 0E2719

Built
2022
3 years old
Condition
Fair
inspected February 2024
Type
Culvert
Concrete
Length
40 ft
1 main span
Daily traffic
1,000
2019 count
Owner
State
State Highway Agency

About this bridge

Porterrockwellblvd over U&sl Canal is a concrete culvert carrying Porterrockwellblvd over U&sl Canal in Salt Lake County, Utah. It was built in 2022, so it is 3 years old, younger than the Utah average of 40.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 1,000 vehicles a day, roughly 8% of them trucks, projected to reach 1,250 by 2039. The structure is 40 ft (12.2 m) long and 345 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesPorterrockwellblvd
CrossesU&sl Canal
LocationBlvd over U&sl Canal
RouteCity Street 131
StateUtah
Coordinates40.463, -111.936
Functional classUrban Other Principal Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionFebruary 2024
Inspection intervalevery 9 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating107.1 US tons
Inventory rating107.1 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHL 93
Structure length40 ft (12.2 m)
Longest span40 ft (12.2 m)
Deck width345 ft (105.3 m)
Roadway width86 ft (26.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,000 (2019)
Projected traffic1,250 by 2039
Trucks8%
Lanes on structure5
Traffic directionHighway traffic not carried
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Porterrockwellblvd over U&sl Canal built?

It was built in 2022, making it 3 years old in 2025.

What condition is Porterrockwellblvd over U&sl Canal in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.

How much traffic does Porterrockwellblvd over U&sl Canal carry?

About 1,000 vehicles per day (2019 count), of which roughly 8% are trucks.

How long is Porterrockwellblvd over U&sl Canal?

The structure is 40 ft (12.2 m) long with a longest span of 40 ft (12.2 m) and a deck 345 ft wide.

Who owns Porterrockwellblvd over U&sl Canal?

It is owned by the State Highway Agency.