US Bridges

US-89 (SR-89) over Jordan & Salt Lake Canal

Fair

Salt Lake County, Utah · At 10100 South State · Structure no. 0E2546

Built
2006
19 years old
Condition
Fair
inspected November 2024
Type
Culvert
Concrete
Length
21 ft
1 main span
Daily traffic
25,945
2014 count
Owner
State
State Highway Agency

About this bridge

US-89 (SR-89) over Jordan & Salt Lake Canal is a concrete culvert carrying US-89 (SR-89) over Jordan & Salt Lake Canal in Salt Lake County, Utah. It was built in 2006, so it is 19 years old, younger than the Utah average of 40.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 25,945 vehicles a day, roughly 10% of them trucks, projected to reach 32,432 by 2034. The structure is 21 ft (6.4 m) long. If it were closed, the detour would be 1.9 mi (3 km).

CarriesUS-89 (SR-89)
CrossesJordan & Salt Lake Canal
LocationAt 10100 South State
RouteU.S. Route 89
StateUtah
Coordinates40.56728, -111.89104
Functional classUrban Other Principal Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating53.6 US tons
Inventory rating42.9 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHL 93
Structure length21 ft (6.4 m)
Longest span19 ft (5.8 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic25,945 (2014)
Projected traffic32,432 by 2034
Trucks10%
Lanes on structure7
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was US-89 (SR-89) over Jordan & Salt Lake Canal built?

It was built in 2006, making it 19 years old in 2025.

What condition is US-89 (SR-89) over Jordan & Salt Lake Canal in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.

How much traffic does US-89 (SR-89) over Jordan & Salt Lake Canal carry?

About 25,945 vehicles per day (2014 count), of which roughly 10% are trucks.

How long is US-89 (SR-89) over Jordan & Salt Lake Canal?

The structure is 21 ft (6.4 m) long with a longest span of 19 ft (5.8 m).

Who owns US-89 (SR-89) over Jordan & Salt Lake Canal?

It is owned by the State Highway Agency.