Riverside Drive over I-215 (SR-215) Ebl &
FairSalt Lake County, Utah · 6200 South 900 W. Murray · Structure no. 0C 649
- Built
- 1975
- 50 years old
- Condition
- Fair
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 274 ft
- 2 main spans
- Daily traffic
- 5,000
- 2012 count
- Owner
- State
- State Highway Agency
About this bridge
Riverside Drive over I-215 (SR-215) Ebl & is a steel continuous stringer/multi-beam or girder carrying Riverside Drive over I-215 (SR-215) Ebl & in Salt Lake County, Utah. It was built in 1975, so it is 50 years old, older than the Utah average of 40.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 5,000 vehicles a day, projected to reach 7,000 by 2034. The structure is 274 ft (83.6 m) long and 34 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Riverside Drive over I-215 (SR-215) Ebl & built?
It was built in 1975, making it 50 years old in 2025.
What condition is Riverside Drive over I-215 (SR-215) Ebl & in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does Riverside Drive over I-215 (SR-215) Ebl & carry?
About 5,000 vehicles per day (2012 count).
How long is Riverside Drive over I-215 (SR-215) Ebl &?
The structure is 274 ft (83.6 m) long with a longest span of 137 ft (41.9 m) and a deck 34 ft wide.
Who owns Riverside Drive over I-215 (SR-215) Ebl &?
It is owned by the State Highway Agency.