US Bridges

9200 West over Utah and Sl Canal

FairPosted for load

Salt Lake County, Utah · 3298 S 9200 W. Sl.Co. · Structure no. 035247E

Built
2022
3 years old
Condition
Fair
inspected December 2023
Type
Culvert
Concrete
Length
25 ft
1 main span
Daily traffic
2,100
2020 count
Owner
City
City or Municipal Highway Agency

About this bridge

9200 West over Utah and Sl Canal is a concrete culvert carrying 9200 West over Utah and Sl Canal in Salt Lake County, Utah. It was built in 2022, so it is 3 years old, younger than the Utah average of 40.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 2,100 vehicles a day, projected to reach 2,625 by 2040. The structure is 25 ft (7.6 m) long and 81 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

Carries9200 West
CrossesUtah and Sl Canal
Location3298 S 9200 W. Sl.Co.
RouteCity Street 0
StateUtah
Coordinates40.70018, -112.11036
Functional classUrban Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating53.6 US tons
Inventory rating42.9 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHL 93
Structure length25 ft (7.6 m)
Longest span23 ft (6.9 m)
Deck width81 ft (24.8 m)
Roadway width41 ft (12.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,100 (2020)
Projected traffic2,625 by 2040
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was 9200 West over Utah and Sl Canal built?

It was built in 2022, making it 3 years old in 2025.

What condition is 9200 West over Utah and Sl Canal in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.

How much traffic does 9200 West over Utah and Sl Canal carry?

About 2,100 vehicles per day (2020 count).

How long is 9200 West over Utah and Sl Canal?

The structure is 25 ft (7.6 m) long with a longest span of 23 ft (6.9 m) and a deck 81 ft wide.

Who owns 9200 West over Utah and Sl Canal?

It is owned by the City or Municipal Highway Agency.