US Bridges

Access to Parking over Sb.Exit from Airport

Fair

Salt Lake County, Utah · SW of Airport · Structure no. 035193C

Built
2005
20 years old
Condition
Fair
inspected January 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
213 ft
2 main spans
Daily traffic
22,208
2022 count
Owner
Local
Other Local Agency

About this bridge

Access to Parking over Sb.Exit from Airport is a steel stringer/multi-beam or girder carrying Access to Parking over Sb.Exit from Airport in Salt Lake County, Utah. It was built in 2005, so it is 20 years old, younger than the Utah average of 40.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 22,208 vehicles a day, roughly 1% of them trucks, projected to reach 26,650 by 2042. The structure is 213 ft (64.9 m) long and 29 ft wide.

CarriesAccess to Parking
CrossesSb.Exit from Airport
LocationSW of Airport
StateUtah
Coordinates40.77714, -111.9909
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Approach roadway alignment8: Equal to present desirable criteria
Operating rating85.8 US tons
Inventory rating42.9 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20 + Mod
Structure length213 ft (64.9 m)
Longest span123 ft (37.5 m)
Deck width29 ft (8.8 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic22,208 (2022)
Projected traffic26,650 by 2042
Trucks1%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerOther Local Agency
Maintained byOther Local Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Access to Parking over Sb.Exit from Airport built?

It was built in 2005, making it 20 years old in 2025.

What condition is Access to Parking over Sb.Exit from Airport in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.

How much traffic does Access to Parking over Sb.Exit from Airport carry?

About 22,208 vehicles per day (2022 count), of which roughly 1% are trucks.

How long is Access to Parking over Sb.Exit from Airport?

The structure is 213 ft (64.9 m) long with a longest span of 123 ft (37.5 m) and a deck 29 ft wide.

Who owns Access to Parking over Sb.Exit from Airport?

It is owned by the Other Local Agency.