US Bridges

Uta Parking Lot RD over East Jordan Canal

Fair

Salt Lake County, Utah · 8900 S. 200 E. Sandy · Structure no. 035176E

Built
1999
26 years old
Condition
Fair
inspected February 2024
Type
Culvert
Concrete
Length
21 ft
1 main span
Daily traffic
2,520
2014 count
Owner
City
City or Municipal Highway Agency

About this bridge

Uta Parking Lot RD over East Jordan Canal is a concrete culvert carrying Uta Parking Lot RD over East Jordan Canal in Salt Lake County, Utah. It was built in 1999, so it is 26 years old, younger than the Utah average of 40.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 2,520 vehicles a day, roughly 1% of them trucks, projected to reach 3,062 by 2034. The structure is 21 ft (6.5 m) long. If it were closed, the detour would be 1.2 mi (2 km).

CarriesUta Parking Lot RD
CrossesEast Jordan Canal
Location8900 S. 200 E. Sandy
StateUtah
Coordinates40.58925, -111.88528
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating35.7 US tons
Inventory rating21.4 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHS 20 + Mod
Structure length21 ft (6.5 m)
Longest span20 ft (6.1 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deck99 ft (30.2 m)

Traffic and service

Average daily traffic2,520 (2014)
Projected traffic3,062 by 2034
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Uta Parking Lot RD over East Jordan Canal built?

It was built in 1999, making it 26 years old in 2025.

What condition is Uta Parking Lot RD over East Jordan Canal in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.

How much traffic does Uta Parking Lot RD over East Jordan Canal carry?

About 2,520 vehicles per day (2014 count), of which roughly 1% are trucks.

How long is Uta Parking Lot RD over East Jordan Canal?

The structure is 21 ft (6.5 m) long with a longest span of 20 ft (6.1 m).

Who owns Uta Parking Lot RD over East Jordan Canal?

It is owned by the City or Municipal Highway Agency.