Lone Peak Parkway over Jordan and Salt Lake C
FairSalt Lake County, Utah · 12000 S. Lone Peak Prkwy. · Structure no. 035156D
- Built
- 1994
- 31 years old, rebuilt 2021
- Condition
- Fair
- inspected January 2024
- Type
- Frame
- Concrete
- Length
- 23 ft
- 1 main span
- Daily traffic
- 14,116
- 2017 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Lone Peak Parkway over Jordan and Salt Lake C is a concrete frame carrying Lone Peak Parkway over Jordan and Salt Lake C in Salt Lake County, Utah. It was built in 1994 and reconstructed in 2021, so it is 31 years old, younger than the Utah average of 40.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 14,116 vehicles a day, roughly 10% of them trucks, projected to reach 16,939 by 2037. The structure is 23 ft (7 m) long and 92 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Lone Peak Parkway over Jordan and Salt Lake C built?
It was built in 1994, making it 31 years old in 2025. It was reconstructed in 2021.
What condition is Lone Peak Parkway over Jordan and Salt Lake C in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.
How much traffic does Lone Peak Parkway over Jordan and Salt Lake C carry?
About 14,116 vehicles per day (2017 count), of which roughly 10% are trucks.
How long is Lone Peak Parkway over Jordan and Salt Lake C?
The structure is 23 ft (7 m) long with a longest span of 20 ft (6.2 m) and a deck 92 ft wide.
Who owns Lone Peak Parkway over Jordan and Salt Lake C?
It is owned by the City or Municipal Highway Agency.