US Bridges

SR-30 over Beckwith Canal

Good

Rich County, Utah · 2.3 Mi. West of Wyo.Line · Structure no. 0E2529

Built
2004
21 years old
Condition
Good
inspected August 2024
Type
Culvert
Concrete
Length
22 ft
1 main span
Daily traffic
700
2014 count
Owner
State
State Highway Agency

About this bridge

SR-30 over Beckwith Canal is a concrete culvert carrying SR-30 over Beckwith Canal in Rich County, Utah. It was built in 2004, so it is 21 years old, younger than the Utah average of 40.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 700 vehicles a day, roughly 40% of them trucks, projected to reach 875 by 2034. The structure is 22 ft (6.7 m) long. If it were closed, the detour would be 49.7 mi (80 km).

CarriesSR-30
CrossesBeckwith Canal
Location2.3 Mi. West of Wyo.Line
RouteState Highway 30
StateUtah
Coordinates41.77539, -111.09131
Functional classRural Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating71.4 US tons
Inventory rating25 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHL 93
Structure length22 ft (6.7 m)
Longest span20 ft (6.1 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deck99 ft (30.2 m)

Traffic and service

Average daily traffic700 (2014)
Projected traffic875 by 2034
Trucks40%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed49.7 mi (80 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR-30 over Beckwith Canal built?

It was built in 2004, making it 21 years old in 2025.

What condition is SR-30 over Beckwith Canal in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does SR-30 over Beckwith Canal carry?

About 700 vehicles per day (2014 count), of which roughly 40% are trucks.

How long is SR-30 over Beckwith Canal?

The structure is 22 ft (6.7 m) long with a longest span of 20 ft (6.1 m).

Who owns SR-30 over Beckwith Canal?

It is owned by the State Highway Agency.