US Bridges

County Road over East Canyon Creek

FairPosted for load

Morgan County, Utah · East of Richville · Structure no. 029020D

Built
2007
18 years old
Condition
Fair
inspected December 2024
Type
Slab
Prestressed Concrete
Length
27 ft
1 main span
Daily traffic
461
2010 count
Owner
County
County Highway Agency

About this bridge

County Road over East Canyon Creek is a prestressed concrete slab carrying County Road over East Canyon Creek in Morgan County, Utah. It was built in 2007, so it is 18 years old, younger than the Utah average of 40.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 461 vehicles a day, roughly 5% of them trucks, projected to reach 560 by 2030. The structure is 27 ft (8.2 m) long and 26 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesCounty Road
CrossesEast Canyon Creek
LocationEast of Richville
RouteCounty Highway 0
StateUtah
Coordinates41.00825, -111.67967
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionDecember 2024
Inspection intervalevery 17 months
Operating statusPosted for load restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating35.7 US tons
Inventory rating21.4 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length27 ft (8.2 m)
Longest span25 ft (7.7 m)
Deck width26 ft (7.9 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic461 (2010)
Projected traffic560 by 2030
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was County Road over East Canyon Creek built?

It was built in 2007, making it 18 years old in 2025.

What condition is County Road over East Canyon Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.

How much traffic does County Road over East Canyon Creek carry?

About 461 vehicles per day (2010 count), of which roughly 5% are trucks.

How long is County Road over East Canyon Creek?

The structure is 27 ft (8.2 m) long with a longest span of 25 ft (7.7 m) and a deck 26 ft wide.

Who owns County Road over East Canyon Creek?

It is owned by the County Highway Agency.