US Bridges

I-15 SB over Dog Valley Access RD

Good

Millard County, Utah · I-15 SB over Dog Valley · Structure no. 3C1062

Built
2022
3 years old
Condition
Good
inspected February 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
78 ft
1 main span
Daily traffic
23,000
2022 count
Owner
State
State Highway Agency

About this bridge

I-15 SB over Dog Valley Access RD is a steel stringer/multi-beam or girder carrying I-15 SB over Dog Valley Access RD in Millard County, Utah. It was built in 2022, so it is 3 years old, younger than the Utah average of 40.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 23,000 vehicles a day, roughly 5% of them trucks, projected to reach 28,750 by 2042. The structure is 78 ft (23.8 m) long and 65 ft wide.

CarriesI-15 SB
CrossesDog Valley Access RD
LocationI-15 SB over Dog Valley
RouteInterstate 15
StateUtah
Coordinates38.65926, -112.59425
Functional classRural Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionFebruary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating50 US tons
Inventory rating39.2 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length78 ft (23.8 m)
Longest span74 ft (22.6 m)
Deck width65 ft (19.8 m)
Roadway width62 ft (18.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic23,000 (2022)
Projected traffic28,750 by 2042
Trucks5%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-15 SB over Dog Valley Access RD built?

It was built in 2022, making it 3 years old in 2025.

What condition is I-15 SB over Dog Valley Access RD in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.

How much traffic does I-15 SB over Dog Valley Access RD carry?

About 23,000 vehicles per day (2022 count), of which roughly 5% are trucks.

How long is I-15 SB over Dog Valley Access RD?

The structure is 78 ft (23.8 m) long with a longest span of 74 ft (22.6 m) and a deck 65 ft wide.

Who owns I-15 SB over Dog Valley Access RD?

It is owned by the State Highway Agency.