Chalk Creek Road over S.F Chalk CR
FairMillard County, Utah · 6 MI East of Fillmore · Structure no. 040801000001029
- Built
- 1965
- 60 years old
- Condition
- Fair
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 34 ft
- 1 main span
- Daily traffic
- 60
- 1982 count
- Owner
- Federal
- U.S. Forest Service
About this bridge
Chalk Creek Road over S.F Chalk CR is a steel stringer/multi-beam or girder carrying Chalk Creek Road over S.F Chalk CR in Millard County, Utah. It was built in 1965, so it is 60 years old, older than the Utah average of 40.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 60 vehicles a day, projected to reach 90 by 2045. The structure is 34 ft (10.4 m) long and 14 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 3 Serious | Loss of section, deterioration, spalling or scour have seriously affected primary structural components. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Chalk Creek Road over S.F Chalk CR built?
It was built in 1965, making it 60 years old in 2025.
What condition is Chalk Creek Road over S.F Chalk CR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does Chalk Creek Road over S.F Chalk CR carry?
About 60 vehicles per day (1982 count).
How long is Chalk Creek Road over S.F Chalk CR?
The structure is 34 ft (10.4 m) long with a longest span of 31 ft (9.4 m) and a deck 14 ft wide.
Who owns Chalk Creek Road over S.F Chalk CR?
It is owned by the U.S. Forest Service.