US Bridges

Whitehouse Road over Tributary to Paria River

Good

Kane County, Utah · 25 MI W. of Lake Powell · Structure no. 0000000L2139748

Built
2024
1 years old
Condition
Good
inspected July 2024
Type
Culvert
Concrete
Length
40 ft
3 main spans
Daily traffic
50
2024 count
Owner
Federal
Bureau of Land Management

About this bridge

Whitehouse Road over Tributary to Paria River is a concrete culvert carrying Whitehouse Road over Tributary to Paria River in Kane County, Utah. It was built in 2024, so it is 1 years old, younger than the Utah average of 40.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 50 vehicles a day, roughly 5% of them trucks, projected to reach 50 by 2044. The structure is 40 ft (12.1 m) long and 21 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

CarriesWhitehouse Road
CrossesTributary to Paria River
Location25 MI W. of Lake Powell
RouteFederal Lands Road 0
StateUtah
Coordinates37.08673, -111.89025
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert8 Very GoodNo problems noted.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourScour evaluation has not been made
Structural evaluation8: Equal to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHL 93
Structure length40 ft (12.1 m)
Longest span12 ft (3.7 m)
Deck width21 ft (6.5 m)
Roadway width19 ft (5.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (2024)
Projected traffic50 by 2044
Trucks5%
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerBureau of Land Management
Maintained byBureau of Land Management
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Whitehouse Road over Tributary to Paria River built?

It was built in 2024, making it 1 years old in 2025.

What condition is Whitehouse Road over Tributary to Paria River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does Whitehouse Road over Tributary to Paria River carry?

About 50 vehicles per day (2024 count), of which roughly 5% are trucks.

How long is Whitehouse Road over Tributary to Paria River?

The structure is 40 ft (12.1 m) long with a longest span of 12 ft (3.7 m) and a deck 21 ft wide.

Who owns Whitehouse Road over Tributary to Paria River?

It is owned by the Bureau of Land Management.