I-15 Nb.Off-Ramp over Union Pacific Railroad
FairJuab County, Utah · So.Of South Nephi Intchg. · Structure no. 1F 450
- Built
- 1984
- 41 years old
- Condition
- Fair
- inspected March 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 222 ft
- 3 main spans
- Daily traffic
- 2,470
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
I-15 Nb.Off-Ramp over Union Pacific Railroad is a prestressed concrete continuous stringer/multi-beam or girder carrying I-15 Nb.Off-Ramp over Union Pacific Railroad in Juab County, Utah. It was built in 1984, so it is 41 years old, older than the Utah average of 40.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 2,470 vehicles a day, roughly 32% of them trucks, projected to reach 2,964 by 2041. The structure is 222 ft (67.7 m) long and 30 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-15 Nb.Off-Ramp over Union Pacific Railroad built?
It was built in 1984, making it 41 years old in 2025.
What condition is I-15 Nb.Off-Ramp over Union Pacific Railroad in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does I-15 Nb.Off-Ramp over Union Pacific Railroad carry?
About 2,470 vehicles per day (2021 count), of which roughly 32% are trucks.
How long is I-15 Nb.Off-Ramp over Union Pacific Railroad?
The structure is 222 ft (67.7 m) long with a longest span of 98 ft (29.9 m) and a deck 30 ft wide.
Who owns I-15 Nb.Off-Ramp over Union Pacific Railroad?
It is owned by the State Highway Agency.