I-70 (SR-70 Wbl) over Missile Base Service RD
FairGrand County, Utah · 4 Mi.East of Green River · Structure no. 4F 349
- Built
- 1981
- 44 years old
- Condition
- Fair
- inspected October 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 82 ft
- 1 main span
- Daily traffic
- 9,579
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
I-70 (SR-70 Wbl) over Missile Base Service RD is a prestressed concrete stringer/multi-beam or girder carrying I-70 (SR-70 Wbl) over Missile Base Service RD in Grand County, Utah. It was built in 1981, so it is 44 years old, older than the Utah average of 40.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 9,579 vehicles a day, roughly 39% of them trucks, projected to reach 11,495 by 2043. The structure is 82 ft (25.1 m) long and 44 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-70 (SR-70 Wbl) over Missile Base Service RD built?
It was built in 1981, making it 44 years old in 2025.
What condition is I-70 (SR-70 Wbl) over Missile Base Service RD in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.
How much traffic does I-70 (SR-70 Wbl) over Missile Base Service RD carry?
About 9,579 vehicles per day (2023 count), of which roughly 39% are trucks.
How long is I-70 (SR-70 Wbl) over Missile Base Service RD?
The structure is 82 ft (25.1 m) long with a longest span of 80 ft (24.4 m) and a deck 44 ft wide.
Who owns I-70 (SR-70 Wbl) over Missile Base Service RD?
It is owned by the State Highway Agency.