US Bridges

SR-279 over Tailings Deposal Haul RD

Fair

Grand County, Utah · 0.2 Mi.So.Jct.With US-191 · Structure no. 0F 795

Built
2010
15 years old
Condition
Fair
inspected September 2023
Type
Culvert
Concrete
Length
70 ft
2 main spans
Daily traffic
478
2022 count
Owner
State
State Highway Agency

About this bridge

SR-279 over Tailings Deposal Haul RD is a concrete culvert carrying SR-279 over Tailings Deposal Haul RD in Grand County, Utah. It was built in 2010, so it is 15 years old, younger than the Utah average of 40.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 478 vehicles a day, roughly 41% of them trucks, projected to reach 574 by 2042. The structure is 70 ft (21.3 m) long. If it were closed, the detour would be 100 mi (161 km).

CarriesSR-279
CrossesTailings Deposal Haul RD
Location0.2 Mi.So.Jct.With US-191
RouteState Highway 279
StateUtah
Coordinates38.60514, -109.60266
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating107.1 US tons
Inventory rating62.5 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckOther
Main spans2
Design loadHL 93
Structure length70 ft (21.3 m)
Longest span16 ft (4.9 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic478 (2022)
Projected traffic574 by 2042
Trucks41%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed100 mi (161 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR-279 over Tailings Deposal Haul RD built?

It was built in 2010, making it 15 years old in 2025.

What condition is SR-279 over Tailings Deposal Haul RD in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.

How much traffic does SR-279 over Tailings Deposal Haul RD carry?

About 478 vehicles per day (2022 count), of which roughly 41% are trucks.

How long is SR-279 over Tailings Deposal Haul RD?

The structure is 70 ft (21.3 m) long with a longest span of 16 ft (4.9 m).

Who owns SR-279 over Tailings Deposal Haul RD?

It is owned by the State Highway Agency.