US Bridges

NFSR 30166 over East Fork Boulder Creek

Good

Garfield County, Utah · No Data Entered · Structure no. 040704000014272

Built
2009
16 years old
Condition
Good
inspected October 2024
Type
Slab
Concrete
Length
28 ft
1 main span
Daily traffic
50
Owner
Federal
U.S. Forest Service

About this bridge

NFSR 30166 over East Fork Boulder Creek is a concrete slab carrying NFSR 30166 over East Fork Boulder Creek in Garfield County, Utah. It was built in 2009, so it is 16 years old, younger than the Utah average of 40.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 50 vehicles a day, projected to reach 75 by 2045. The structure is 28 ft (8.4 m) long and 25 ft wide. If it were closed, the detour would be 98.2 mi (158 km).

CarriesNFSR 30166
CrossesEast Fork Boulder Creek
LocationNo Data Entered
RouteFederal Lands Road 30166
StateUtah
Coordinates38.0018, -111.466
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating30.8 US tons
Inventory rating23.9 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length28 ft (8.4 m)
Longest span26 ft (8 m)
Deck width25 ft (7.6 m)
Roadway width23 ft (7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (—)
Projected traffic75 by 2045
Trucks—
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed98.2 mi (158 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerU.S. Forest Service
Maintained byU.S. Forest Service
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was NFSR 30166 over East Fork Boulder Creek built?

It was built in 2009, making it 16 years old in 2025.

What condition is NFSR 30166 over East Fork Boulder Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does NFSR 30166 over East Fork Boulder Creek carry?

About 50 vehicles per day (latest count).

How long is NFSR 30166 over East Fork Boulder Creek?

The structure is 28 ft (8.4 m) long with a longest span of 26 ft (8 m) and a deck 25 ft wide.

Who owns NFSR 30166 over East Fork Boulder Creek?

It is owned by the U.S. Forest Service.