SR-208 over Duchesne River
FairDuchesne County, Utah · 9.7 Mi.North of JCT.US-40 · Structure no. 0D 569
- Built
- 1959
- 66 years old, rebuilt 2015
- Condition
- Fair
- inspected May 2023
- Type
- Frame
- Concrete
- Length
- 85 ft
- 1 main span
- Daily traffic
- 450
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
SR-208 over Duchesne River is a concrete frame carrying SR-208 over Duchesne River in Duchesne County, Utah. It was built in 1959 and reconstructed in 2015, so it is 66 years old, older than the Utah average of 40.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 450 vehicles a day, roughly 50% of them trucks, projected to reach 540 by 2042. The structure is 85 ft (25.9 m) long and 32 ft wide. If it were closed, the detour would be 49.7 mi (80 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR-208 over Duchesne River built?
It was built in 1959, making it 66 years old in 2025. It was reconstructed in 2015.
What condition is SR-208 over Duchesne River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.
How much traffic does SR-208 over Duchesne River carry?
About 450 vehicles per day (2022 count), of which roughly 50% are trucks.
How long is SR-208 over Duchesne River?
The structure is 85 ft (25.9 m) long with a longest span of 75 ft (22.9 m) and a deck 32 ft wide.
Who owns SR-208 over Duchesne River?
It is owned by the State Highway Agency.