US Bridges

Yellowstone Loop over No Data Entered

Good

Duchesne County, Utah · 10 Mile N of Mt Home · Structure no. 040103000032773

Built
2019
6 years old
Condition
Good
inspected September 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
80 ft
1 main span
Daily traffic
50
Owner
Federal
U.S. Forest Service

About this bridge

Yellowstone Loop over No Data Entered is a steel stringer/multi-beam or girder carrying Yellowstone Loop over No Data Entered in Duchesne County, Utah. It was built in 2019, so it is 6 years old, younger than the Utah average of 40.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 50 vehicles a day, projected to reach 75 by 2045. The structure is 80 ft (24.4 m) long and 24 ft wide. If it were closed, the detour would be 620.7 mi (999 km).

CarriesYellowstone Loop
CrossesNo Data Entered
Location10 Mile N of Mt Home
RouteFederal Lands Road 10119
StateUtah
Coordinates40.54642, -110.33367
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment5: Somewhat better than minimum adequacy to tolerate being left in place as is
Operating rating85.3 US tons
Inventory rating66 US tons

Structure

MaterialSteel
DeckCorrugated steel
Main spans1
Design loadHL 93
Structure length80 ft (24.4 m)
Longest span79 ft (24.1 m)
Deck width24 ft (7.3 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (—)
Projected traffic75 by 2045
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed620.7 mi (999 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerU.S. Forest Service
Maintained byU.S. Forest Service
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Yellowstone Loop over No Data Entered built?

It was built in 2019, making it 6 years old in 2025.

What condition is Yellowstone Loop over No Data Entered in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does Yellowstone Loop over No Data Entered carry?

About 50 vehicles per day (latest count).

How long is Yellowstone Loop over No Data Entered?

The structure is 80 ft (24.4 m) long with a longest span of 79 ft (24.1 m) and a deck 24 ft wide.

Who owns Yellowstone Loop over No Data Entered?

It is owned by the U.S. Forest Service.