I-215SB (SR-215) over Jordan River
FairDavis County, Utah · I-215 SB @ Legacy in · Structure no. 3F 701
- Built
- 2008
- 17 years old
- Condition
- Fair
- inspected June 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 213 ft
- 2 main spans
- Daily traffic
- —
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
I-215SB (SR-215) over Jordan River is a prestressed concrete stringer/multi-beam or girder carrying I-215SB (SR-215) over Jordan River in Davis County, Utah. It was built in 2008, so it is 17 years old, younger than the Utah average of 40.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
No traffic count is recorded. The structure is 213 ft (64.8 m) long and 43 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-215SB (SR-215) over Jordan River built?
It was built in 2008, making it 17 years old in 2025.
What condition is I-215SB (SR-215) over Jordan River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.
How much traffic does I-215SB (SR-215) over Jordan River carry?
No traffic count is recorded for this structure.
How long is I-215SB (SR-215) over Jordan River?
The structure is 213 ft (64.8 m) long with a longest span of 158 ft (48.1 m) and a deck 43 ft wide.
Who owns I-215SB (SR-215) over Jordan River?
It is owned by the State Highway Agency.