US Bridges

SR-177 over Davis-Steed Creek

Good

Davis County, Utah · SR-177 Davis-Steed Creek · Structure no. 3E2773

Built
2023
2 years old
Condition
Good
inspected December 2023
Type
Culvert
Concrete
Length
20 ft
1 main span
Daily traffic
3,400
2023 count
Owner
State
State Highway Agency

About this bridge

SR-177 over Davis-Steed Creek is a concrete culvert carrying SR-177 over Davis-Steed Creek in Davis County, Utah. It was built in 2023, so it is 2 years old, younger than the Utah average of 40.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,400 vehicles a day, projected to reach 6,300 by 2043. The structure is 20 ft (6.2 m) long and 173 ft wide.

CarriesSR-177
CrossesDavis-Steed Creek
LocationSR-177 Davis-Steed Creek
RouteState Highway 177
StateUtah
Coordinates40.95778, -111.89333
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionDecember 2023
Inspection intervalevery 18 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation*: *
Deck geometry9: Superior to present desirable criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating—
Inventory rating—

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHL 93
Structure length20 ft (6.2 m)
Longest span20 ft (6.2 m)
Deck width173 ft (52.7 m)
Roadway width173 ft (52.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,400 (2023)
Projected traffic6,300 by 2043
Trucks0%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR-177 over Davis-Steed Creek built?

It was built in 2023, making it 2 years old in 2025.

What condition is SR-177 over Davis-Steed Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does SR-177 over Davis-Steed Creek carry?

About 3,400 vehicles per day (2023 count).

How long is SR-177 over Davis-Steed Creek?

The structure is 20 ft (6.2 m) long with a longest span of 20 ft (6.2 m) and a deck 173 ft wide.

Who owns SR-177 over Davis-Steed Creek?

It is owned by the State Highway Agency.