US Bridges

Gordon Avenue over Gordon Avenue

Good

Davis County, Utah · US-89 under Gordon Ave · Structure no. 0F 907

Built
2022
3 years old
Condition
Good
inspected June 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
161 ft
2 main spans
Daily traffic
1,000
2020 count
Owner
State
State Highway Agency

About this bridge

Gordon Avenue over Gordon Avenue is a prestressed concrete stringer/multi-beam or girder carrying Gordon Avenue over Gordon Avenue in Davis County, Utah. It was built in 2022, so it is 3 years old, younger than the Utah average of 40.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,000 vehicles a day, roughly 5% of them trucks, projected to reach 1,125 by 2040. The structure is 161 ft (49.1 m) long and 84 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesGordon Avenue
CrossesGordon Avenue
LocationUS-89 under Gordon Ave
RouteCity Street 1474
StateUtah
Coordinates41.031, -111.909
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating39.2 US tons
Inventory rating28.5 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length161 ft (49.1 m)
Longest span84 ft (25.5 m)
Deck width84 ft (25.5 m)
Roadway width68 ft (20.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,000 (2020)
Projected traffic1,125 by 2040
Trucks5%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Gordon Avenue over Gordon Avenue built?

It was built in 2022, making it 3 years old in 2025.

What condition is Gordon Avenue over Gordon Avenue in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does Gordon Avenue over Gordon Avenue carry?

About 1,000 vehicles per day (2020 count), of which roughly 5% are trucks.

How long is Gordon Avenue over Gordon Avenue?

The structure is 161 ft (49.1 m) long with a longest span of 84 ft (25.5 m) and a deck 84 ft wide.

Who owns Gordon Avenue over Gordon Avenue?

It is owned by the State Highway Agency.