300 North Street over Weber-Davis Canal
FairDavis County, Utah · 350 E.300 N. Clearfield · Structure no. 011007F
- Built
- 1965
- 60 years old
- Condition
- Fair
- inspected March 2024
- Type
- Tee Beam
- Prestressed Concrete
- Length
- 32 ft
- 1 main span
- Daily traffic
- 1,008
- 2010 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
300 North Street over Weber-Davis Canal is a prestressed concrete tee beam carrying 300 North Street over Weber-Davis Canal in Davis County, Utah. It was built in 1965, so it is 60 years old, older than the Utah average of 40.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,008 vehicles a day, roughly 1% of them trucks, projected to reach 1,225 by 2030. The structure is 32 ft (9.8 m) long and 44 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was 300 North Street over Weber-Davis Canal built?
It was built in 1965, making it 60 years old in 2025.
What condition is 300 North Street over Weber-Davis Canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.
How much traffic does 300 North Street over Weber-Davis Canal carry?
About 1,008 vehicles per day (2010 count), of which roughly 1% are trucks.
How long is 300 North Street over Weber-Davis Canal?
The structure is 32 ft (9.8 m) long with a longest span of 29 ft (8.7 m) and a deck 44 ft wide.
Who owns 300 North Street over Weber-Davis Canal?
It is owned by the City or Municipal Highway Agency.