US-191 (SR-191) over Willow Creek
FairPosted for loadCarbon County, Utah · 8 MI No of JCT With SR-6 · Structure no. 0D 669
- Built
- 1962
- 63 years old
- Condition
- Fair
- inspected August 2023
- Type
- Frame
- Concrete
- Length
- 52 ft
- 1 main span
- Daily traffic
- 2,375
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
US-191 (SR-191) over Willow Creek is a concrete frame carrying US-191 (SR-191) over Willow Creek in Carbon County, Utah. It was built in 1962, so it is 63 years old, older than the Utah average of 40.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 2,375 vehicles a day, roughly 42% of them trucks, projected to reach 2,850 by 2042. The structure is 52 ft (15.7 m) long and 31 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US-191 (SR-191) over Willow Creek built?
It was built in 1962, making it 63 years old in 2025.
What condition is US-191 (SR-191) over Willow Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.
How much traffic does US-191 (SR-191) over Willow Creek carry?
About 2,375 vehicles per day (2022 count), of which roughly 42% are trucks.
How long is US-191 (SR-191) over Willow Creek?
The structure is 52 ft (15.7 m) long with a longest span of 46 ft (14.1 m) and a deck 31 ft wide.
Who owns US-191 (SR-191) over Willow Creek?
It is owned by the State Highway Agency.