County Road over Bear River
FairCache County, Utah · 0.5 Mile No. of Benson · Structure no. 005031F
- Built
- 1965
- 60 years old
- Condition
- Fair
- inspected May 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 182 ft
- 3 main spans
- Daily traffic
- 1,650
- 2014 count
- Owner
- County
- County Highway Agency
About this bridge
County Road over Bear River is a prestressed concrete stringer/multi-beam or girder carrying County Road over Bear River in Cache County, Utah. It was built in 1965, so it is 60 years old, older than the Utah average of 40.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,650 vehicles a day, roughly 5% of them trucks, projected to reach 2,060 by 2034. The structure is 182 ft (55.4 m) long and 33 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Road over Bear River built?
It was built in 1965, making it 60 years old in 2025.
What condition is County Road over Bear River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.
How much traffic does County Road over Bear River carry?
About 1,650 vehicles per day (2014 count), of which roughly 5% are trucks.
How long is County Road over Bear River?
The structure is 182 ft (55.4 m) long with a longest span of 60 ft (18.4 m) and a deck 33 ft wide.
Who owns County Road over Bear River?
It is owned by the County Highway Agency.