SR-13 over Malad River
FairBox Elder County, Utah · South of Plymouth · Structure no. 0D 345
- Built
- 1933
- 92 years old, rebuilt 1984
- Condition
- Fair
- inspected April 2023
- Type
- Tee Beam
- Concrete Continuous
- Length
- 65 ft
- 3 main spans
- Daily traffic
- 1,318
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
SR-13 over Malad River is a concrete continuous tee beam carrying SR-13 over Malad River in Box Elder County, Utah. It was built in 1933 and reconstructed in 1984, so it is 92 years old, older than the Utah average of 40.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,318 vehicles a day, roughly 31% of them trucks, projected to reach 1,582 by 2041. The structure is 65 ft (19.8 m) long and 44 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR-13 over Malad River built?
It was built in 1933, making it 92 years old in 2025. It was reconstructed in 1984.
What condition is SR-13 over Malad River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does SR-13 over Malad River carry?
About 1,318 vehicles per day (2021 count), of which roughly 31% are trucks.
How long is SR-13 over Malad River?
The structure is 65 ft (19.8 m) long with a longest span of 65 ft (19.8 m) and a deck 44 ft wide.
Who owns SR-13 over Malad River?
It is owned by the State Highway Agency.