I-15NB (SR-15) over Co.Rd. W of Manderfield
GoodBeaver County, Utah · 4.6 Mi. N. of Beaver · Structure no. 1F 853
- Built
- 2013
- 12 years old
- Condition
- Good
- inspected February 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 78 ft
- 1 main span
- Daily traffic
- 24,161
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
I-15NB (SR-15) over Co.Rd. W of Manderfield is a prestressed concrete stringer/multi-beam or girder carrying I-15NB (SR-15) over Co.Rd. W of Manderfield in Beaver County, Utah. It was built in 2013, so it is 12 years old, younger than the Utah average of 40.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 24,161 vehicles a day, roughly 30% of them trucks, projected to reach 28,993 by 2042. The structure is 78 ft (23.8 m) long and 45 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-15NB (SR-15) over Co.Rd. W of Manderfield built?
It was built in 2013, making it 12 years old in 2025.
What condition is I-15NB (SR-15) over Co.Rd. W of Manderfield in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.
How much traffic does I-15NB (SR-15) over Co.Rd. W of Manderfield carry?
About 24,161 vehicles per day (2022 count), of which roughly 30% are trucks.
How long is I-15NB (SR-15) over Co.Rd. W of Manderfield?
The structure is 78 ft (23.8 m) long with a longest span of 74 ft (22.6 m) and a deck 45 ft wide.
Who owns I-15NB (SR-15) over Co.Rd. W of Manderfield?
It is owned by the State Highway Agency.