US Bridges

FM 61 over Salt Creek

Good

Young County, Texas · 0.3 MI NW of SH 67 · Structure no. 032520052901003

Built
1958
67 years old, rebuilt 1979
Condition
Good
inspected September 2023
Type
Stringer/Multi-beam or Girder
Concrete
Length
120 ft
3 main spans
Daily traffic
2,478
2023 count
Owner
State
State Highway Agency

About this bridge

FM 61 over Salt Creek is a concrete stringer/multi-beam or girder carrying FM 61 over Salt Creek in Young County, Texas. It was built in 1958 and reconstructed in 1979, so it is 67 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,478 vehicles a day, roughly 6% of them trucks, projected to reach 3,640 by 2040. The structure is 120 ft (36.6 m) long and 42 ft wide. If it were closed, the detour would be 14.3 mi (23 km).

CarriesFM 61
CrossesSalt Creek
Location0.3 MI NW of SH 67
RouteState Highway 61
StateTexas
Coordinates33.11503, -98.59521
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourScour evaluation has not been made
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating51 US tons
Inventory rating30 US tons

Structure

MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadOther
Structure length120 ft (36.6 m)
Longest span40 ft (12.2 m)
Deck width42 ft (12.9 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,478 (2023)
Projected traffic3,640 by 2040
Trucks6%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed14.3 mi (23 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FM 61 over Salt Creek built?

It was built in 1958, making it 67 years old in 2025. It was reconstructed in 1979.

What condition is FM 61 over Salt Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does FM 61 over Salt Creek carry?

About 2,478 vehicles per day (2023 count), of which roughly 6% are trucks.

How long is FM 61 over Salt Creek?

The structure is 120 ft (36.6 m) long with a longest span of 40 ft (12.2 m) and a deck 42 ft wide.

Who owns FM 61 over Salt Creek?

It is owned by the State Highway Agency.