US Bridges

Sl 564 over Sabine Rv TR

Good

Wood County, Texas · 1.2 Miles SW of US 80 · Structure no. 102500324001001

Built
2006
19 years old
Condition
Good
inspected September 2024
Type
Culvert
Concrete
Length
22 ft
2 main spans
Daily traffic
2,239
2018 count
Owner
State
State Highway Agency

About this bridge

Sl 564 over Sabine Rv TR is a concrete culvert carrying Sl 564 over Sabine Rv TR in Wood County, Texas. It was built in 2006, so it is 19 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,239 vehicles a day, roughly 10% of them trucks, projected to reach 2,630 by 2033. The structure is 22 ft (6.7 m) long. If it were closed, the detour would be 1.9 mi (3 km).

CarriesSl 564
CrossesSabine Rv TR
Location1.2 Miles SW of US 80
RouteState Highway 564
StateTexas
Coordinates32.6435, -95.47437
Functional classRural Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHS 20
Structure length22 ft (6.7 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,239 (2018)
Projected traffic2,630 by 2033
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Sl 564 over Sabine Rv TR built?

It was built in 2006, making it 19 years old in 2025.

What condition is Sl 564 over Sabine Rv TR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does Sl 564 over Sabine Rv TR carry?

About 2,239 vehicles per day (2018 count), of which roughly 10% are trucks.

How long is Sl 564 over Sabine Rv TR?

The structure is 22 ft (6.7 m) long with a longest span of 10 ft (3 m).

Who owns Sl 564 over Sabine Rv TR?

It is owned by the State Highway Agency.