US Bridges

CR 4757 Pct 3 over Trib to W Fork Trnty Riv

Good

Wise County, Texas · 1.1 Mi. W. of FM 718 · Structure no. 022490AA0352003

Built
1998
27 years old
Condition
Good
inspected January 2024
Type
Stringer/Multi-beam or Girder
Concrete
Length
60 ft
2 main spans
Daily traffic
914
2019 count
Owner
County
County Highway Agency

About this bridge

CR 4757 Pct 3 over Trib to W Fork Trnty Riv is a concrete stringer/multi-beam or girder carrying CR 4757 Pct 3 over Trib to W Fork Trnty Riv in Wise County, Texas. It was built in 1998, so it is 27 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 914 vehicles a day, projected to reach 150 by 2042. The structure is 60 ft (18.3 m) long and 30 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesCR 4757 Pct 3
CrossesTrib to W Fork Trnty Riv
Location1.1 Mi. W. of FM 718
RouteCounty Highway 4757
StateTexas
Coordinates33.03556, -97.53339
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating75 US tons
Inventory rating45 US tons

Structure

MaterialConcrete
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length60 ft (18.3 m)
Longest span29 ft (8.8 m)
Deck width30 ft (9.1 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic914 (2019)
Projected traffic150 by 2042
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was CR 4757 Pct 3 over Trib to W Fork Trnty Riv built?

It was built in 1998, making it 27 years old in 2025.

What condition is CR 4757 Pct 3 over Trib to W Fork Trnty Riv in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.

How much traffic does CR 4757 Pct 3 over Trib to W Fork Trnty Riv carry?

About 914 vehicles per day (2019 count).

How long is CR 4757 Pct 3 over Trib to W Fork Trnty Riv?

The structure is 60 ft (18.3 m) long with a longest span of 29 ft (8.8 m) and a deck 30 ft wide.

Who owns CR 4757 Pct 3 over Trib to W Fork Trnty Riv?

It is owned by the County Highway Agency.