FM 537 over Cibolo Creek
GoodWilson County, Texas · 3.6 MI SW of SH 123 S · Structure no. 152470100902098
- Built
- 2021
- 4 years old
- Condition
- Good
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 300 ft
- 5 main spans
- Daily traffic
- 900
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
FM 537 over Cibolo Creek is a prestressed concrete stringer/multi-beam or girder carrying FM 537 over Cibolo Creek in Wilson County, Texas. It was built in 2021, so it is 4 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 900 vehicles a day, roughly 3% of them trucks, projected to reach 1,400 by 2040. The structure is 300 ft (91.4 m) long and 36 ft wide. If it were closed, the detour would be 8.7 mi (14 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FM 537 over Cibolo Creek built?
It was built in 2021, making it 4 years old in 2025.
What condition is FM 537 over Cibolo Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.
How much traffic does FM 537 over Cibolo Creek carry?
About 900 vehicles per day (2021 count), of which roughly 3% are trucks.
How long is FM 537 over Cibolo Creek?
The structure is 300 ft (91.4 m) long with a longest span of 60 ft (18.3 m) and a deck 36 ft wide.
Who owns FM 537 over Cibolo Creek?
It is owned by the State Highway Agency.