US Bridges

183A SB over Hero Way Blvd

Good

Williamson County, Texas · 4.2 MI N of FM 1431 · Structure no. 142460T00183037

Built
2012
13 years old, rebuilt 2023
Condition
Good
inspected September 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
275 ft
1 main span
Daily traffic
35,207
2011 count
Owner
Toll Authority
Local Toll Authority

About this bridge

183A SB over Hero Way Blvd is a prestressed concrete stringer/multi-beam or girder carrying 183A SB over Hero Way Blvd in Williamson County, Texas. It was built in 2012 and reconstructed in 2023, so it is 13 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 35,207 vehicles a day, roughly 5% of them trucks, projected to reach 60,106 by 2031. The structure is 275 ft (83.8 m) long and 70 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

Carries183A SB
CrossesHero Way Blvd
Location4.2 MI N of FM 1431
StateTexas
Coordinates30.58731, -97.83954
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionSeptember 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1 (+2 approach)
Design loadHL 93
Structure length275 ft (83.8 m)
Longest span125 ft (38.1 m)
Deck width70 ft (21.3 m)
Roadway width68 ft (20.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic35,207 (2011)
Projected traffic60,106 by 2031
Trucks5%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a toll road
National Highway SystemYes

Ownership and planned work

OwnerLocal Toll Authority
Maintained byLocal Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was 183A SB over Hero Way Blvd built?

It was built in 2012, making it 13 years old in 2025. It was reconstructed in 2023.

What condition is 183A SB over Hero Way Blvd in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does 183A SB over Hero Way Blvd carry?

About 35,207 vehicles per day (2011 count), of which roughly 5% are trucks.

How long is 183A SB over Hero Way Blvd?

The structure is 275 ft (83.8 m) long with a longest span of 125 ft (38.1 m) and a deck 70 ft wide.

Who owns 183A SB over Hero Way Blvd?

It is owned by the Local Toll Authority.