Northern Trail over Branch of Mason Creek
FairPosted for loadWilliamson County, Texas · 0.02 MI NW of Eagles Way · Structure no. 142460H02772001
- Built
- 1980
- 45 years old
- Condition
- Fair
- inspected November 2023
- Type
- Culvert
- Concrete
- Length
- 24 ft
- 3 main spans
- Daily traffic
- 560
- 2010 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Northern Trail over Branch of Mason Creek is a concrete culvert carrying Northern Trail over Branch of Mason Creek in Williamson County, Texas. It was built in 1980, so it is 45 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 560 vehicles a day, projected to reach 1,000 by 2030. The structure is 24 ft (7.3 m) long and 49 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 7 Good | Some minor problems. |
| Culvert | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Northern Trail over Branch of Mason Creek built?
It was built in 1980, making it 45 years old in 2025.
What condition is Northern Trail over Branch of Mason Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.
How much traffic does Northern Trail over Branch of Mason Creek carry?
About 560 vehicles per day (2010 count).
How long is Northern Trail over Branch of Mason Creek?
The structure is 24 ft (7.3 m) long with a longest span of 7 ft (2.1 m) and a deck 49 ft wide.
Who owns Northern Trail over Branch of Mason Creek?
It is owned by the City or Municipal Highway Agency.