US Bridges

Chardonnay Xing over Draw

Good

Williamson County, Texas · 0.25 MI E of Napa Valley · Structure no. 142460H01280001

Built
2002
23 years old
Condition
Good
inspected November 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
83 ft
1 main span
Daily traffic
450
2020 count
Owner
City
City or Municipal Highway Agency

About this bridge

Chardonnay Xing over Draw is a prestressed concrete stringer/multi-beam or girder carrying Chardonnay Xing over Draw in Williamson County, Texas. It was built in 2002, so it is 23 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 450 vehicles a day, projected to reach 300 by 2030. The structure is 83 ft (25.3 m) long and 46 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesChardonnay Xing
CrossesDraw
Location0.25 MI E of Napa Valley
RouteCity Street 0
StateTexas
Coordinates30.55748, -97.82761
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadUnknown
Structure length83 ft (25.3 m)
Longest span80 ft (24.4 m)
Deck width46 ft (14 m)
Roadway width33 ft (10.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic450 (2020)
Projected traffic300 by 2030
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Chardonnay Xing over Draw built?

It was built in 2002, making it 23 years old in 2025.

What condition is Chardonnay Xing over Draw in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does Chardonnay Xing over Draw carry?

About 450 vehicles per day (2020 count).

How long is Chardonnay Xing over Draw?

The structure is 83 ft (25.3 m) long with a longest span of 80 ft (24.4 m) and a deck 46 ft wide.

Who owns Chardonnay Xing over Draw?

It is owned by the City or Municipal Highway Agency.