US Bridges

Harvey Penick DR over Forest Creek

Good

Williamson County, Texas · 0.40 MI SE of Forest Crk · Structure no. 142460E03285001

Built
2003
22 years old
Condition
Good
inspected September 2023
Type
Culvert
Concrete
Length
52 ft
4 main spans
Daily traffic
400
2010 count
Owner
City
City or Municipal Highway Agency

About this bridge

Harvey Penick DR over Forest Creek is a concrete culvert carrying Harvey Penick DR over Forest Creek in Williamson County, Texas. It was built in 2003, so it is 22 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 400 vehicles a day, projected to reach 600 by 2030. The structure is 52 ft (15.9 m) long. If it were closed, the detour would be 1.2 mi (2 km).

CarriesHarvey Penick DR
CrossesForest Creek
Location0.40 MI SE of Forest Crk
RouteCity Street 0
StateTexas
Coordinates30.50563, -97.60046
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans4
Design loadUnknown
Structure length52 ft (15.9 m)
Longest span13 ft (4 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic400 (2010)
Projected traffic600 by 2030
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Harvey Penick DR over Forest Creek built?

It was built in 2003, making it 22 years old in 2025.

What condition is Harvey Penick DR over Forest Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does Harvey Penick DR over Forest Creek carry?

About 400 vehicles per day (2010 count).

How long is Harvey Penick DR over Forest Creek?

The structure is 52 ft (15.9 m) long with a longest span of 13 ft (4 m).

Who owns Harvey Penick DR over Forest Creek?

It is owned by the City or Municipal Highway Agency.