Db Wood RD over Mid Fk San Gabriel Ri
FairWilliamson County, Texas · 1.12 MI N of SH 29 · Structure no. 142460D01670002
- Built
- 2002
- 23 years old
- Condition
- Fair
- inspected October 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 80 ft
- 1 main span
- Daily traffic
- 11,880
- 2010 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Db Wood RD over Mid Fk San Gabriel Ri is a prestressed concrete stringer/multi-beam or girder carrying Db Wood RD over Mid Fk San Gabriel Ri in Williamson County, Texas. It was built in 2002, so it is 23 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 11,880 vehicles a day, roughly 2% of them trucks, projected to reach 21,385 by 2030. The structure is 80 ft (24.4 m) long and 30 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Db Wood RD over Mid Fk San Gabriel Ri built?
It was built in 2002, making it 23 years old in 2025.
What condition is Db Wood RD over Mid Fk San Gabriel Ri in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.
How much traffic does Db Wood RD over Mid Fk San Gabriel Ri carry?
About 11,880 vehicles per day (2010 count), of which roughly 2% are trucks.
How long is Db Wood RD over Mid Fk San Gabriel Ri?
The structure is 80 ft (24.4 m) long with a longest span of 80 ft (24.4 m) and a deck 30 ft wide.
Who owns Db Wood RD over Mid Fk San Gabriel Ri?
It is owned by the City or Municipal Highway Agency.