US Bridges

Rivery Blvd over N Fork San Gabriel

Good

Williamson County, Texas · 0.16 MI S of Williams DR · Structure no. 142460D00378001

Built
2003
22 years old
Condition
Good
inspected October 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
350 ft
4 main spans
Daily traffic
5,000
2010 count
Owner
City
City or Municipal Highway Agency

About this bridge

Rivery Blvd over N Fork San Gabriel is a prestressed concrete stringer/multi-beam or girder carrying Rivery Blvd over N Fork San Gabriel in Williamson County, Texas. It was built in 2003, so it is 22 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,000 vehicles a day, roughly 2% of them trucks, projected to reach 8,000 by 2030. The structure is 350 ft (106.7 m) long and 76 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesRivery Blvd
CrossesN Fork San Gabriel
Location0.16 MI S of Williams DR
RouteCity Street 0
StateTexas
Coordinates30.65291, -97.68608
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating69 US tons
Inventory rating39 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans4
Design loadHS 20
Structure length350 ft (106.7 m)
Longest span125 ft (38.1 m)
Deck width76 ft (23.2 m)
Roadway width58 ft (17.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,000 (2010)
Projected traffic8,000 by 2030
Trucks2%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Rivery Blvd over N Fork San Gabriel built?

It was built in 2003, making it 22 years old in 2025.

What condition is Rivery Blvd over N Fork San Gabriel in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does Rivery Blvd over N Fork San Gabriel carry?

About 5,000 vehicles per day (2010 count), of which roughly 2% are trucks.

How long is Rivery Blvd over N Fork San Gabriel?

The structure is 350 ft (106.7 m) long with a longest span of 125 ft (38.1 m) and a deck 76 ft wide.

Who owns Rivery Blvd over N Fork San Gabriel?

It is owned by the City or Municipal Highway Agency.