US Bridges

Echo Park DR over Draw

Good

Williamson County, Texas · 0.14 MI S of Journey Pkwy · Structure no. 142460AA8650001

Built
2016
9 years old
Condition
Good
inspected December 2023
Type
Culvert
Concrete
Length
49 ft
5 main spans
Daily traffic
68
2020 count
Owner
County
County Highway Agency

About this bridge

Echo Park DR over Draw is a concrete culvert carrying Echo Park DR over Draw in Williamson County, Texas. It was built in 2016, so it is 9 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 68 vehicles a day, roughly 1% of them trucks, projected to reach 180 by 2038. The structure is 49 ft (14.9 m) long. If it were closed, the detour would be 1.2 mi (2 km).

CarriesEcho Park DR
CrossesDraw
Location0.14 MI S of Journey Pkwy
RouteCounty Highway 0
StateTexas
Coordinates30.56483, -97.78042
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans5
Design loadUnknown
Structure length49 ft (14.9 m)
Longest span9 ft (2.7 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic68 (2020)
Projected traffic180 by 2038
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Echo Park DR over Draw built?

It was built in 2016, making it 9 years old in 2025.

What condition is Echo Park DR over Draw in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does Echo Park DR over Draw carry?

About 68 vehicles per day (2020 count), of which roughly 1% are trucks.

How long is Echo Park DR over Draw?

The structure is 49 ft (14.9 m) long with a longest span of 9 ft (2.7 m).

Who owns Echo Park DR over Draw?

It is owned by the County Highway Agency.