Southeast Loop over Soil Cs Site 21 Pond
GoodWilliamson County, Texas · 1.4 MI E of SH 130 Nbfr · Structure no. 142460AA2020010
- Built
- 2023
- 2 years old
- Condition
- Good
- inspected December 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 625 ft
- 7 main spans
- Daily traffic
- 10,000
- 2017 count
- Owner
- County
- County Highway Agency
About this bridge
Southeast Loop over Soil Cs Site 21 Pond is a prestressed concrete stringer/multi-beam or girder carrying Southeast Loop over Soil Cs Site 21 Pond in Williamson County, Texas. It was built in 2023, so it is 2 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 10,000 vehicles a day, roughly 2% of them trucks, projected to reach 1 by 1900. The structure is 625 ft (190.5 m) long and 54 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Southeast Loop over Soil Cs Site 21 Pond built?
It was built in 2023, making it 2 years old in 2025.
What condition is Southeast Loop over Soil Cs Site 21 Pond in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.
How much traffic does Southeast Loop over Soil Cs Site 21 Pond carry?
About 10,000 vehicles per day (2017 count), of which roughly 2% are trucks.
How long is Southeast Loop over Soil Cs Site 21 Pond?
The structure is 625 ft (190.5 m) long with a longest span of 91 ft (27.7 m) and a deck 54 ft wide.
Who owns Southeast Loop over Soil Cs Site 21 Pond?
It is owned by the County Highway Agency.