Waycross DR over Mid Fork San Gabriel Rv
FairWilliamson County, Texas · 0.05 MI NE of Cedarhollow · Structure no. 142460AA0601001
- Built
- 1989
- 36 years old
- Condition
- Fair
- inspected October 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 142 ft
- 2 main spans
- Daily traffic
- 560
- 2010 count
- Owner
- County
- County Highway Agency
About this bridge
Waycross DR over Mid Fork San Gabriel Rv is a prestressed concrete stringer/multi-beam or girder carrying Waycross DR over Mid Fork San Gabriel Rv in Williamson County, Texas. It was built in 1989, so it is 36 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 560 vehicles a day, projected to reach 780 by 2030. The structure is 142 ft (43.3 m) long and 30 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Waycross DR over Mid Fork San Gabriel Rv built?
It was built in 1989, making it 36 years old in 2025.
What condition is Waycross DR over Mid Fork San Gabriel Rv in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.
How much traffic does Waycross DR over Mid Fork San Gabriel Rv carry?
About 560 vehicles per day (2010 count).
How long is Waycross DR over Mid Fork San Gabriel Rv?
The structure is 142 ft (43.3 m) long with a longest span of 70 ft (21.3 m) and a deck 30 ft wide.
Who owns Waycross DR over Mid Fork San Gabriel Rv?
It is owned by the County Highway Agency.