US Bridges

Chandler RD over Pipeline Right of Way

Good

Williamson County, Texas · 1.4 MI E of FM 1660 · Structure no. 142460AA0533506

Built
2013
12 years old
Condition
Good
inspected December 2023
Type
Slab
Prestressed Concrete
Length
55 ft
1 main span
Daily traffic
7,843
2020 count
Owner
County
County Highway Agency

About this bridge

Chandler RD over Pipeline Right of Way is a prestressed concrete slab carrying Chandler RD over Pipeline Right of Way in Williamson County, Texas. It was built in 2013, so it is 12 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 7,843 vehicles a day, roughly 2% of them trucks, projected to reach 200 by 2030. The structure is 55 ft (16.8 m) long and 40 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesChandler RD
CrossesPipeline Right of Way
Location1.4 MI E of FM 1660
RouteCounty Highway 0
StateTexas
Coordinates30.60134, -97.51785
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckOther
Main spans1
Design loadHL 93
Structure length55 ft (16.8 m)
Longest span54 ft (16.5 m)
Deck width40 ft (12.2 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,843 (2020)
Projected traffic200 by 2030
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesOther
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Chandler RD over Pipeline Right of Way built?

It was built in 2013, making it 12 years old in 2025.

What condition is Chandler RD over Pipeline Right of Way in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does Chandler RD over Pipeline Right of Way carry?

About 7,843 vehicles per day (2020 count), of which roughly 2% are trucks.

How long is Chandler RD over Pipeline Right of Way?

The structure is 55 ft (16.8 m) long with a longest span of 54 ft (16.5 m) and a deck 40 ft wide.

Who owns Chandler RD over Pipeline Right of Way?

It is owned by the County Highway Agency.