Chandler RD over Pipeline Right of Way
GoodWilliamson County, Texas · 1.4 MI E of FM 1660 · Structure no. 142460AA0533506
- Built
- 2013
- 12 years old
- Condition
- Good
- inspected December 2023
- Type
- Slab
- Prestressed Concrete
- Length
- 55 ft
- 1 main span
- Daily traffic
- 7,843
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
Chandler RD over Pipeline Right of Way is a prestressed concrete slab carrying Chandler RD over Pipeline Right of Way in Williamson County, Texas. It was built in 2013, so it is 12 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 7,843 vehicles a day, roughly 2% of them trucks, projected to reach 200 by 2030. The structure is 55 ft (16.8 m) long and 40 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Chandler RD over Pipeline Right of Way built?
It was built in 2013, making it 12 years old in 2025.
What condition is Chandler RD over Pipeline Right of Way in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.
How much traffic does Chandler RD over Pipeline Right of Way carry?
About 7,843 vehicles per day (2020 count), of which roughly 2% are trucks.
How long is Chandler RD over Pipeline Right of Way?
The structure is 55 ft (16.8 m) long with a longest span of 54 ft (16.5 m) and a deck 40 ft wide.
Who owns Chandler RD over Pipeline Right of Way?
It is owned by the County Highway Agency.